Home      Contact      Plan du site      Rejoignez-nous      ES   I   EN   I   FR   I   PT

Travaux Singulières

Travaux Singulières

PIEUX BATTU EN BÉTON

TERRATEST
Precast Piles
Access Roads Senegambia Bridge
Precast Piles

Piling Works - Access Roads Senegambia Bridge

Precast Piles
Combined Cycle Power Plant at
Barcelona Sea Port (Spain)
Precast Piles

The foundation works for the new Combined Cycle Power Plant at Barcelona Port (Spain) were executed using TERRA precast piles, during the period February 2.008 – January 2.009.

Precast Piles
Structures E-4.1, E-5.1, E-7 Y E-8.1
Castellbisbal/Mollet junction, Mollet (Barcelona)
Precast Piles

Between February and November 2009, the foundation was made in three piling operations by means of Terra precast piles in structures E-4.1, E-5.1, E-5.3.1, E-7 y E-8.1 of the branch line, Castellbisbal/Mollet, Mollet junction in Castellbisbal (Barcelona).

Precast Piles
Tunu and Ogotobo Crude Oil Separation Stations
(Nigeria)
Precast Piles

Between the months of January 2014 and June 2014, the precast pile foundation of the Tunu and Ogotobo crude oil separation stations was carried out. Those sites are located at the Bayelsa State in Nigeria.



PIEUX FORÉS

TERRATEST
Precast Piles
Trans Gambia Bridge (The Gambia)
Bored Piles

Steel Piles for the foundation of the Trans Gambia Bridge (The Gambia)

Precast Piles
Stabilization. Salobreña
Bored Piles

Slope stabilization Urbanization Alfamar, (Granada).



CFA ET INCLUSION RIGIDE

TERRATEST
CFA
Mokwa, Niger State, Nigeria
CFA

Golden Sugar Company Limited - Sunti Project Ml-12123



MICROPIEUX

TERRATEST
Micropilotes
Caja Burgos Museum of
Contemporary Art (Burgos)
Micropiles

Anchored Micropile Curtain for the“Caja Burgos” Museum ofContemporary Art (Burgos).



PAROIS MOULÉES

TERRATEST
Diaphragm Walls-trench Cutter
Madrid-Barcelona HST (Spain)
TMB Excavation for HST in Barcelona
Hidromill Diaphragm Wall and Pile Retaining Wall

The project is located in the heart of Barcelona. The scope is to execute protection for TBM excavation for the buildings and singular monuments, in the most important commercial area of ​​Barcelona, with a high density of shops and tourism places.

Diaphragm Walls-trench Cutter
Madrid-Barcelona HST (Spain)
HST Girona Station
Hidromill Diaphragm Wall and Pile Retaining Wall

Terratest has executed the foundation of the future AVE Station in Girona, acting as main contractor directly for the UTE AVE GIRONA. The foundation works started on November 2008 and finish April 2010, including the execution of the perimeter diaphragm wall of the station, the foundation bearing elements, and a provisional pile retaining wall inside the station.



PAROI CLOUÉE

TERRATEST


ANCRAGES

TERRATEST
Ground Anchors
Bracing of access banks and wall for an
installation building in
the Somport Tunnel (Huesca)
Ground Anchors

Execution of the following works has been proceeded with for bracing of the access banks to the new Somport Tunnel, as well as for the foundations corresponding to the control buildings for said tunnel.

Ground Anchors
Anchored Micro-Pile for a building in Azca (Madrid)
Ground Anchors

An anchored micro-pile screen was executed for the El Corte Ingles building in Azca (Madrid).



GEOPIER® Systems

TERRATEST
Soluciones GEOPIER®
Naves “Nuevo Seseña”,
Seseña (Toledo)
Solutions GEOPIER®

Mejora del Terreno Mediante Sistema Geopier® GP3 de Columnas de Grava Compactadas para Cimentación de las Naves “Nuevo Seseña” en Seseña (Toledo)


Soluciones GEOPIER®
Centro Comercial Open Sky,
Torrejón de Ardoz (Madrid)
Solutions GEOPIER®

Mejora del Terreno Mediante Sistema Geopier® Impact de Columnas de Grava Compactadas para Lago Central del Centro Comercial Open Sky, Torrejón de Ardoz (Madrid)


Solutions GEOPIER®
Nave Almacenamiento en Muelle Cabezuela,
Puerto Real (Cádiz)
Solutions GEOPIER®

Mejora del Terreno mediante Sistema Geopier® GCC de Inclusiones Rígidas para Nave Almacenamiento en Muelle Cabezuela, Puerto Real (Cádiz).


Solutions GEOPIER®
Naves en el Muelle Aragón, Puerto de Tarragona
Solutions GEOPIER®

Mejora del Terreno Mediante Sistema Geopier® Impact de Columnas de Grava Compactadas para Naves en el Muelle Aragón, Puerto de Tarragona.

Solutions GEOPIER®
Plataforma Logística Stef en Algoz, Portugal
Solutions GEOPIER®

Mejora del Terreno Mediante Sistema Geopier® GP3 de Columnas de Grava Compactadas para Plataforma Logística Stef en Algoz, Portugal.



DRAINS VERTICAUX

TERRATEST
Vertical Drains
Preload treatment by means of Wick
Drains in the Calamocha E.D.A.R.
(Waste Water Purifying Plant) (Teruel)
Vertical Drains

Preload treatment was executed during the month of March of 2000, by means of Wick Drains for consolidation of the terrain at the Calamocha Purifying Plant (Teruel).

Vertical Drains
Preload treatment by means of Wick Drains in
the Airfield of the Prat de Llobregat Airport
(Barcelona)
Vertical Drains

The preload treatment by means of Wick Drains for consolidation of the soil at the Barcelona Airport was executed in the month of December of 2000.



BUTONS

TERRATEST


COLONNES DE BALLAST

TERRATEST


JET GROUTING

TERRATEST
Jet Grouting
Bilbao Metro (Spain) Underground Line Works
Jet Grouting

The work involved the execution of a waterproof bottom slab with Jet-grouting columns, along the future track path situated between diaphragm walls performed for the excavation. Once the columns were tested, we proceeded to design the required distribution and type sections.

Jet Grouting
Madrid Metro (Spain) TBM Excavation
Jet Grouting

The soil improvement treatment executed by Jet grouting type I, was carried out to avoid possible terrain settling brought about by the TBM ground excavation during the execution of the metro tunnel. For that reason, Jet grouting columns with inverted V shape, were deployed in almost the whole surface to be treated, the only modification applied being the inclination of the columns.

Jet Grouting
Madrid Metro (Spain) TBM Excavation
Jet Grouting

The soil improvement treatment executed by Jet grouting type I, was carried out to avoid possible terrain settling brought about by the TBM ground excavation during the execution of the metro tunnel. For that reason, Jet grouting columns with inverted V shape, were deployed in almost the whole surface to be treated, the only modification applied being the inclination of the columns. A number of tests were carried out prior to the execution of the works, to ensure that the appropriate parameters influenced by the ground conditions were taken into account.



INJECTIONS

TERRATEST
Injections Solide
Metro Tunnel Karlsruhe
Injections Solide

City Metro Tunnel Karlsrhue Manchette Pipe Grouting.



INJECTIONS DE COMPENSATION

TERRATEST
Injections de Compensation
Tunnel Schumann Josaphat
Injections de Compensation

Tunnel Schumann Josaphat Brussels (Belgium).



INJECTIONS SOLIDE

TERRATEST


PALPLANCHES

TERRATEST


MICRO-TUNNEL

TERRATEST


PARAPLUE DE CONDUITE

TERRATEST
Paraplue de Conduite
Metro Line U3 Munich Olympiapark
Paraplue de Conduite

Metro Line U3 Munich Olympiapark Horizontal Injections in Tunnel.



FORAGE DIRECTIONNEL HORIZONTAL

TERRATEST


TRAVAUX ENVIRONNEMENTAUX

TERRATEST


CONGÉLATION DE SOL

TERRATEST
Congélation de sol
Metro Warsaw Congélation de sol
Congélation de Sol

Second Warsaw metro Line. Mixed method ground freezing at station C13 Powisle underneath the Wislostrada Tunnel.

Congélation de sol
Slovacki Tunnel Danzig Poland
Congélation de Sol

Road Tunnel 1,1 km long and 11 m internal diameter crossing under the so called Dead Vistula river in the vicinity of Danzig (Poland).

Congélation de sol
City Tunnel Leipzig
Congélation de Sol

Twin Metro tunnel crossing under the main building of the Central Station of Leipzig in Germany.



INGÉNIERIE

TERRATEST
Ingénierie
ACKNOWLEDGEMENT AND GEOTECHNICAL STUDY
Geotechnical Study

Acknowledgement and geotechnical study at Alcalá de Henares, Madrid.



AUSCULTATION

TERRATEST
Auscultation
Asurvey of the Ecological Wall
in Cabanas (A Coruña)
Auscultation

The extension of the AC-141 road between the towns of Cabañas and Goente in Corunna required the augmentation of the side of the mountain through the technique of ecological walls.

Auscultation
Installation of four Piezometers
at the Arbón Dam (Asturias)
Auscultation

Auscultation of the Arbón Dam was reinforced by placing 4 vibrating wire piezometers in the abutments of the clay core. The piezometers were embedded at the bottom of 4 bore holes executed from the crowning. Perforation was in dry and with continuous extraction of the check sample.



Terratest Image Gallery Piles, Excavation Support, Ground Freezing, Tunneling,

Environmental Works, Ground Freezing, Engineering

Groupe Terratest https://www.terratest.com/